top of page
Flores & Sons LLC
Remodeling & Handyman Services
(865) 518-2572
Photos
Bathrooms
Bathroom update

Tub before
The half-wall behind the faucets had water damage and had to be completely replaced. The tub surround was removed and replaced as well as all the fixtures.

Whole bathroom before
The half-wall in this picture had to be completely redone due to water damage. The sink was moved and replaced with a larger vanity. The air vent was relocated to accommodate the new vanity.

Before
This sink was removed.

Before
The heater on this wall was completely removed and the sink replaced and relocated.

Progress
Progress

Progress
With the surround removed.

Progress
The wall going back in. Plumbing ready for a new vanity and air vent moved.

Drywall "patch"
No more heater or sink plumbing. Drywall, smooth and repaired.

Tub After
New fixtures, surround and floor

After
New vanity, light, mirror, fixtures and floor.

After
Smooth wall and toilet area

After
New floors, vanity, fixtures, mirror, light and vent.
Bathroom Update

Before
Old vanity, carpet, builder basics

After
New vanity, mirror, tile (unseen)

Before
Old vanity, vinyl floors

After
New vanity, new groutable vinyl floors

After
New vanity, mirror, cabinet, towel bar and toilet paper holder.

Before

After
New sheet vinyl and newbaseboards
Bathroom Before



Kitchens
Kitchen Before


Kitchen After



New Backsplash



Kitchen Before
Carpentry
Closet Shelving



Handcrafted Island
Closet Shelving
Painting
Stairwell






New Dining
Room Color




Stairwell
Exterior
Siding


Trimming bushes










Vent covers




Porch rails





Siding
Other
Fireplace facelift


Floor fix


Tiling an entryway


Insulation for soundproofing




Fireplace facelift
bottom of page